Unit Wise Machineries
Unit I | |||
Machinery | Make |
Year of Installation
|
No of Machines
|
Blow room | LMW |
2010
|
3
|
Card | LMW (LC-333) |
2010
|
24
|
Lap Former | LMW (LH-10) |
2010
|
1
|
Comber | LMW (LK-64) |
2010
|
4
|
Breaker D/F | LMW (LD-2) |
2010
|
5
|
Finisher D/F | LMW (RSB 851) |
2010
|
10
|
Speed Frame | LMW (LR 4200 A) |
2011
|
14
|
Ring Frame | LMW (LR9 / AXL-Link Coner) |
2014
|
24
|
Auto Coner | Schlafhorst (338/X5) |
2007/ 2009
|
10
|
Link Coner | Savio |
2014
|
10
|
TFO | Vijay Laxmi (150M) | 2007 | 21 |
Slub Attachment | Laxmi Capio | 2017 | 4 |
Unit II | |||
Machinery | Make |
Year of Installation
|
No of Machines
|
Blow Room | LMW |
2007
|
2
|
Carding | LMW(LC-300) |
2007
|
28
|
Lap Former | LMW(LH-10) |
2007
|
2
|
Comber | LMW(LK-54) |
2007
|
10
|
Breaker D/F | LMW(DO/6) |
2007
|
7
|
Finisher D/F | LMW (RSB-851) |
2007
|
9
|
Simplex | LMW (LF 1600A) |
2007
|
13
|
Ring Frame | LMW(LR 6A/X) |
2007
|
26
|
Autoconer | Schlafhorst (338) |
2007
|
11
|
TFO | Vijay Laxmi (150M) | 2007 | 6 |
Unit III | |||
Machinery | Make |
No of Machines
|
|
Blow Room | LMW |
3
|
Equipped with Contamination Clearing System that removes colored, white, transparent, PP Contaminants in Cotton |
Carding | LMW(LC 363) |
26
|
Equipped with triple/single licker-in arrangement, highest active flats & optimum waste extraction. |
Lap Former | LMW |
3
|
|
Comber | LMW (LK 64Z) |
12
|
Equipped with piecing assistance in drafting zone |
Breaker D/F | LMW (LD-2) |
5
|
|
Finisher D/F | LMW (LRSB851) |
10
|
Equipped with DLC – Electronic Levelling System for short, medium and long term variation |
Simplex | LMW(LF4200/AX) |
8
|
Equipped with auto doffer and bobbin transport system from Sohler Neuenhauser and automatic roving tension controller |
Ring Frame | LMW(LR9/AX) |
24
|
Equipped with auto doffer, auto servo drive and ring data systems |
Link Coner | Savoi (Polar) |
24
|
Equipped with “Uster Quantum 3" with Polypropolyene (PP) & Dark Foreign Fibre (FFD) clearing devices ensures removal of PP and colored contaminants |